STATUS

The current state of the needs analysis

What is running, what is being prepared, and when each regime’s rules were last checked against the source. This page is the register that used to sit in the footer.

State as of: 2026-09-02

OVERALL STATEOPERATIONAL

The website and the needs analysis are active.

The needs analysis is live at quickcheck.clearosystems.com. Measured figures (availability and time to complete) are published only once its monitoring supplies them: until then they read “coming soon”. Everything else on this page is maintained by hand, with the date on which that last happened.

COMPONENTS

What runs, and what is still coming

  • Website, knowledge base and contact formOPERATIONAL

    The pages, the knowledge base, the blog and the contact form. This part is live; a message through the form reaches the team, and e-mail and telephone are equally open.

  • The question flowOPERATIONAL

    The guided questions about role, products, sales channels and target countries — 54 modelled starting situations across the three regimes the analysis asks about (packaging, WEEE and batteries). Live at quickcheck.clearosystems.com.

  • Preview of your obligations profileOPERATIONAL

    The per-country profile as it appears on screen right after the analysis: registrations, risks and additional duties. Live, as part of the question flow.

  • Full report by e-mail and exportOPERATIONAL

    Delivery of the full report, with sources and the recommended order, once you leave your contact details. Live, as part of the question flow.

  • Quote and contract routeIN PREPARATION

    The automatic step from profile to quote and contract, inside the same route. Under construction.

  • Hand-over to specialistsOPERATIONAL

    Registration, reporting and authorised representation, carried out by our own specialists.

  • Volume reporting and marketplace handlingIN PREPARATION

    Ongoing volume reports and handling of marketplace checks. Planned for 2026.

FIGURES

The analysis in numbers

  • COMING SOONavailability over the last 30 days
  • COMING SOONmedian time to complete the analysis, in minutes
  • 28countries in scope: the EU-27 plus Switzerland
  • 54modelled starting situations in the decision logic

RULE DATA

When each regime was last checked

The decision logic rests on rules that move. Per regime we record when they were last put against the source.

  1. Packaging · NetherlandsVerpact and the 50,000 kg threshold from the 2014 Packaging Management Decree, which stays in force through 2026; the PPWR with its first obligations from 12 August 2026.checked 2026-08-10
  2. Electronics (WEEE) · NetherlandsStichting OPEN, registration and reporting duties.checked 2026-08-04
  3. Batteries · NetherlandsStichting OPEN, which has also run batteries since 01.01.2024; built-in and separately sold cells.checked 2026-08-10
  4. Textiles · NetherlandsUPV Textiel: registration through Rijkswaterstaat, then compliance individually or through a producer organisation. Footwear is not in scope yet.checked 2026-08-10
  5. GermanyLUCID (VerpackDG), stiftung ear (ElektroG) and the BattDG register.checked 2026-08-20

INCIDENTS

No incident history yet

No incident has been established since the needs analysis went live on 2026-09-02. Every established incident appears here with the time, the components affected and what was done about it. The entry stays after it is resolved.

CHANGES

What changed recently

  1. The comparison pages were taken offline; their addresses now redirect to the How it works page.

  2. The needs analysis went live at quickcheck.clearosystems.com. The question flow, the profile preview and the report delivery read operational; the measured figures follow once monitoring is wired up.

  3. Packaging correction: 12 August 2026 is the PPWR’s application date (conformity and role determination), not the day the Dutch 50,000 kg threshold falls away. That threshold applies for the whole of 2026 and is expected to lapse with the national producer register in 2027/2028. The earlier wording appeared on several pages and has been corrected everywhere.

  4. Status register cleaned up: only what actually runs reads operational. The website is active; the question flow, the profile preview and the report delivery read “in preparation” until the needs analysis is in production.

  5. Report delivery: the full report goes out by e-mail or as an export once you leave your contact details. The preview of your profile stays on screen straight away.

  6. Battery rules re-checked against Stichting OPEN; built-in cells now explicit in the decision logic.

  7. Six comparisons with other EPR service providers went live, with a source and retrieval date per fact.

Want to see what applies to your business?

Currently only for companies whose home market is the Netherlands, Austria or Switzerland. Coming soon for Germany.